Ridgeline Precision Machining Inc.
Quality Policy
Doc no.
QP-01
Rev
0
Effective
2026-10-08
Owner
President (Dana Whitaker)
Approved by
President (Dana Whitaker)
ISO 9001:2026 clauses
5.2 · 5.1.2
This policy states what Ridgeline Precision Machining commits to on quality and how every person at the Dayton Plant applies it. It is the starting point for the quality objectives in QP-03.
Our quality policy
Ridgeline Precision Machining makes CNC milled components, CNC turned components and machined assemblies in aluminum, steel and stainless at our Dayton Plant. We build prototypes and low-to-medium volume runs to our customers' drawings for industrial OEMs in agricultural equipment, hydraulics and packaging machinery. Our customers count on us for parts that match the drawing, arrive on the promised date and come with the right paperwork. That is what quality means here.
What we commit to
- Meet every customer requirement: the drawing, the PO, material certs with the shipment, first article reports on new parts and revisions, and heat or lot traceability from material to shipment.
- Meet the extra rules of key customers such as Hartwell Hydraulics, as set out in QP-11.
- Meet the laws that apply to our work, including OSHA rules and forklift training.
- Ship on time, and tell the customer early when a date is at risk.
- Keep improving our quality management system. We fix problems at the root (QP-20), act on audit results and customer feedback, and review how the system works at least once a year.
How we set quality objectives
This policy is the frame for our measurable quality objectives. Each objective comes from one of the commitments above. QP-03 sets the targets, owners and actions; progress is reviewed at the monthly quality review and at management review.
| ID | Objective area | Commitment it supports |
|---|---|---|
| OBJ-1 | On-time delivery to all customers | Ship on time |
| OBJ-2 | On-time delivery to Hartwell Hydraulics | Meet key-customer requirements |
| OBJ-3 | Fewer customer returns | Meet the drawing and PO |
| OBJ-4 | Lower internal scrap | Keep improving |
| OBJ-5 | Supplier on-time delivery | Ship on time |
| OBJ-6 | Corrective actions done on time | Fix problems at the root |
What we expect from everyone
- Think about the customer who will bolt our part into their machine. If you would not accept it, do not pass it on.
- Never ship or pass on a part you know or suspect is bad. Put a red HOLD tag on it and tell the Quality Manager (QP-16).
- Record what really happened: travelers, inspection results, certs. Honest records protect our customers and us.
- Speak up about problems, late material or machine trouble. Raise it at the Monday shop meeting or use the President's open door. Nobody is blamed for reporting a problem.
- Follow the current drawing, program and traveler. Ask if anything is unclear.
How the policy is shared and used
| How | Who | When |
|---|---|---|
| Posted on the shop notice board and in the office, with the objectives | Quality Manager | At issue, 2026-10 |
| Explained in staff awareness sessions, with the IK-02 quiz (QP-07) | Quality Manager | All sessions done by 2026-11; refresher in 2027-02 |
| Explained to new employees on their first day | Operations Manager | Each new hire |
| Talked through with real examples at the Monday shop meeting | President | Ongoing |
| Applied through daily work: travelers, first-piece checks, red HOLD tags, NCRs and CARs | Everyone | Every job |
| Controlled copy kept in QMS/Current on SharePoint; copy given to customers, suppliers and the registrar on request | Quality Manager | On request |
Internal audits (QP-18) check that people know the policy and that work on the floor matches it.
Approval and review
This policy is set by Dana Whitaker, President, as top management of Ridgeline Precision Machining. The President reviews it at every management review (once a year in February; the first in 2027-02, see QP-19) and updates it if our business, customers or direction change, such as adding a second 5-axis cell or winning new ISO-required OEM work.